MCA Senegal 2 – Transmission Lines (2023-2025)

Introduction The objective of MCA Senegal 2 project was to lay a pair of around 17 km transmission cables across the bay of Dakar to carry power from the power plant to Senegal’s capital. The route ran mainly through a subsea trench, with land sections installed mostly using horizontal directional drilling (HDD). GeoIntel supported the project […]